akhras.net ajoz.org livbutler.com bmyanmar.com zirity.com dactins.com

TCN ANNOUNCES NEW TRANSFORMERS AND LINES INSTALLATION

0

In line with the policy of this administration on incremental power, the Transmission Company of Nigeria (TCN) hereby state that within last week it completed the installation of the following transformers and transmission line; 1X60MWA power transformer in Katsina Substation, 1X100MVA transformer in Ejigbo Substation and 2X60MVA in Odogunyan substation both in Lagos, 1X60MVA transformer in Old Abeokuta Substation, as well as 1X60MVA transformer in Calabar Substation. TCN has also energised the 5KM transmission line built with the collaboration of Enugu State Government to power the 1X30MVA Nsukka Substation. TCN wish to commend the effort of the Governor of Enugu State for the collaboration that enabled the completion of the line.

The transformers have been energised and supplying various communities where they are located. They add to the several transformers, substations and transmission lines completed across the country either by TCN in-house engineers or by contractors and are ready for the official commissioning by the Honourable Minister of Power Works and Housing, Mr. Babatunde Raji Fashola.

According to the General Manager Public Affairs, Mrs Ndidi Mbah with this development, the power supply rationing recently experienced by customers of Ikeja Electricity Distribution Company around Ejigbo when the old 1X30MVA was removed to pave way for the installation of the new 1x100MVA is expected to stop. Installation of another 1X100 MVA to replace the second 1X30MVA in the same substation has also commenced, completion would further boost transmission capacity in that axis.

She noted that the installation of the 1X60MVA transformer at Karu substation, in Abuja has been completed but is undergoing pre-commissioning tests. It is expected to be energised before Friday March 8, 2018. Similarly, installation of 1X60MVA at Dan Agundi Substation in Kano has reached advanced stage, so also is the replacement of 1X60MVA LEEEC Model transformer razed by fire during installation in Uyo last week by TCN contractors Messrs. T & D Technologies Limited.

TCN wishes to assure Nigerians that such low quality transformers which were procured in 2011 will not find their way into the National Grid again. This is because necessary steps for the fortification and standardization of substations, lines and major equipment have been taken. TCN has also for the first time included certification by reputable international testing laboratories as requirement for its procurement.

The General Manager Public Affairs commended the patience of electricity consumers in Kaduna town whose supply has been affected by the re-conducting of the 132kV transmission line from Mando Substation to Kakuri Substation. She noted that the re-conducting is absolutely necessary to enable TCN supply enough electricity to the 2X60MVA transformers which are at their final stages of installation in the TCN Substation, Kakuri.

She further stated that although the Nigeria Electricity Industry is still facing liquidity problem, the only way that TCN’s rehabilitation and expansion programme can give maximum benefit to the nation, is if a commensurate investment is done on the various distribution networks nationwide. Presently, inadequacies in the distribution networks are limiting the amount of power delivered to end-users on daily basis. This problem is pronounced anytime there is heavy rainfall. This calls for significant investments in the distribution network.

The incident of Thursday 22nd at Lokoja substation was caused by the weak distribution network that dropped significant load due to heavy rainfall which caused high voltage that shattered lighting arrestor that punctured the cooling fin of the 150MVA transformer and more than 10 drums of transformer oil gushed out. TCN stand by its press release on this issue last week.

TCN is aware of locations in its network where improvement is still required and assured that they are being addressed through various installations. It is equally looking forward to working in harmony with other sector players to ensure Nigerians derive maximum benefit from these investments in its network.

Leave A Reply

Your email address will not be published.